Plan the backlog, run the sprint, and link GitHub so the board reflects reality — from first ticket to shipped, with velocity you can actually forecast.
Backlog, points and a sprint board built the way engineers work.
An AI risk scan and a live Gantt flag slippage before it bites.
Link commits and PRs; a task auto-completes when its PR merges.
Groom the backlog into epics and stories, then pull the sprint onto a board with swimlanes, WIP limits and story points.
Lay the release on a Gantt with typed dependencies and a critical path, so a slip in one place shows up everywhere it matters.
Point the sprint, watch the burndown, and use velocity and cycle time to forecast when the rest of the backlog lands.
Grounded in real work — not a rigid process bolted on.